The project is marketed with an Okeechobee identity. The land described in the official materials is in unincorporated Glades County, east of State Road 78 and north of Tomato Grade Road.
Site updated +
Sources added through Nov 1, 2026; each fact retains its own date.
Glades County records checked through . Individual sources and historical collection batches retain their own dates.
The November 1 county permit review identified occupancy certificates for 81 distinct permits, dated October 7–30, 2026. There are 82 original PDFs because permit 2500254 has two variants.
The earliest reviewed certificate is October 7 for 1833 Rashi Drive. Certificates establish county occupancy approval; they do not count residents or homebuyer closings.
The November 1 county permit review identified occupancy certificates for 81 distinct permits, dated October 7–30, 2026. There are 82 original PDFs because permit 2500254 has two variants. 80 permits are newly identified relative to the October 8 baseline: 79 certificates dated after October 8 and one October 7 certificate. Screened all 303 unique permits in the Owner Okeechobee Comm query. This is not a count of actual residents, homebuyer closings, or all county issuances.
Glades County November 1 occupancy-certificate review: 303 permits screened
Document date
Nov 1, 2026
Source type
Public record
Confidence
Primary source
Location
21 search result pages; 303 detail captures; 82 original certificate PDFs
November 1, 2026 screening of all 303 unique permits on 21 result pages for Owner: Okeechobee Comm, with no date filters and no final failed detail reads. This is a defined owner-query review, not a certified county issuance log or a search under every possible owner. OCD and Lakefront owner follow-ups were blocked by a reCAPTCHA-service connection warning; no negative finding is inferred. 81 distinct permits have certificates; two PDFs for 2500254 count once. The detailed inspection register retains 225 October 8 snapshots.
Glades County Certificate of Occupancy — 1833 Rashi Dr, permit 2500272
Document date
Oct 7, 2026
Source type
Public record
Confidence
Primary source
Location
PDF page 1; certificate date, permit, building location and unit count
Certificate dated 2026-10-07 for permit 2500272, 1833 Rashi Dr, stating one building and one residential unit. Reviewed November 1, 2026. The date is printed on the certificate; upload and discovery dates are separate. An occupancy certificate does not establish a sale, deed recording, actual move-in or resident count.
Glades County Certificate of Occupancy — 1964 RASHI DR, permit 2500259
Document date
Oct 8, 2026
Source type
Public record
Confidence
Primary source
Location
PDF page 1; certificate date, permit, building location and unit count
Certificate dated 2026-10-08 for permit 2500259, 1964 RASHI DR, stating one building and one residential unit. Reviewed November 1, 2026. The date is printed on the certificate; upload and discovery dates are separate. An occupancy certificate does not establish a sale, deed recording, actual move-in or resident count. The visible signature and embedded signature field identify Building Official Judson Dulany, dated October 8 at 9:56 a.m. Eastern time; the earlier blank-signature description was incorrect. This previously identified October 8 certificate is byte-identical to the earlier archive; the newly found October 7 certificate supersedes its earlier first-date description.
Glades County Certificate of Occupancy — 1414 BINYAMINA PLACE, permit 2600364
Document date
Oct 30, 2026
Source type
Public record
Confidence
Primary source
Location
PDF page 1; certificate date, permit, building location and unit count
Certificate dated 2026-10-30 for permit 2600364, 1414 BINYAMINA PLACE, stating one building and one residential unit. Reviewed November 1, 2026. The date is printed on the certificate; upload and discovery dates are separate. An occupancy certificate does not establish a sale, deed recording, actual move-in or resident count.
Before Lakefront, Glenn Harvey Planned Development.#
Lakefront’s land history includes a May 17, 2013 deed from Marlene Ballin and Sidney Fink to Glenn C. Harvey, recorded May 28. The predecessor Glenn Harvey Planned Development had planning documented by a June 29, 2017 traffic study and county approval in 2020, before the November 2021 developer acquisition. Signed Ordinance 2022-11 renamed and expanded it as Lakefront Estates on January 23, 2023.
Public recordSources (6) ↗
Source record
Evidence behind the record
Supports
Lakefront’s land history includes a May 17, 2013 deed from Marlene Ballin and Sidney Fink to Glenn C. Harvey, recorded May 28. The predecessor Glenn Harvey Planned Development had planning documented by a June 29, 2017 traffic study and county approval in 2020, before the November 2021 developer acquisition. Signed Ordinance 2022-11 renamed and expanded it as Lakefront Estates on January 23, 2023.
Glades County RZ18-04 staff packet — Harvey planning history from 2017
Document date
Feb 11, 2020
Source type
Public record
Confidence
Primary source
Location
PDF pages 3–8: agent, hearing history, land use, revised access and traffic studies
Staff report revised February 4 for the February 11 hearing. Page 8 identifies traffic studies dated June 29, 2017 and October 18, 2018; pages 4–5 trace the 2018 hearings and 2019 delays. This establishes planning by 2017, not the exact start of the project.
Recorded 2021-11-16. Document dated 2021-11-09. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 30, 2026.
Signed Ordinance 2022-11 — Lakefront name change and expanded development approval
Document date
Jan 23, 2023
Source type
Public record
Confidence
Primary source
Location
PDF pages 64–72; signed adoption on page 67; residential and land-use comparison on page 72
Signed ordinance reproduced in the March 27, 2024 CDD meeting book. The signed adoption page says January 23, 2023. Its incorporated comparison describes 482 previously approved detached homes and an amended 1,300-home program. Development-agreement recitals elsewhere cite January 10 for rezoning.
Recorded 2013-05-28; supplied/downloaded 2026-11-01. All supplied pages extracted; recording stamps and selected source pages visually reviewed. Retrieve by instrument number. PDF page citations refer to the supplied file. The November 1 follow-up leads folder supplied seventeen candidate PDFs with ninety-three pages. The download log marked identity and relevance pending; local checksum, page-stamp and source-page review retained sixteen instruments with eighty-six pages, including predecessor-land records, and excluded a seven-page SFWMD regional test-well bond from the Lakefront register. The original download log is preserved; normalized extraction indexes were generated locally. Selected Harvey, contractor and Lakefront legal-description searches expand the earlier name-search collection; they are not a complete title or court search. The supplied captures retain an October 28 verification cutoff. Matched label(s): HARVEY GLENN C. Query slug(s) in the supplied log: harvey-gl. This establishes a documented 2013 conveyance, not an exhaustive ownership chain, the original inception of development or an individual Lakefront home closing. Later road deductions, separate land strips and changed survey calls mean that historical and current acreage should not be equated without a survey.
Recorded 2021-03-15; supplied/downloaded 2026-11-01. All supplied pages extracted; recording stamps and selected source pages visually reviewed. Retrieve by instrument number. PDF page citations refer to the supplied file. The November 1 follow-up leads folder supplied seventeen candidate PDFs with ninety-three pages. The download log marked identity and relevance pending; local checksum, page-stamp and source-page review retained sixteen instruments with eighty-six pages, including predecessor-land records, and excluded a seven-page SFWMD regional test-well bond from the Lakefront register. The original download log is preserved; normalized extraction indexes were generated locally. Selected Harvey, contractor and Lakefront legal-description searches expand the earlier name-search collection; they are not a complete title or court search. The supplied captures retain an October 28 verification cutoff. Matched label(s): HARVEY GLENN. Query slug(s) in the supplied log: harvey-gl. This is the executed, recorded version of the earlier agreement, supplementing the previously cited May 2020 agenda packet. Later Lakefront approvals and utility records must be read separately; the 482-home program is not the current approved or built-home count.
The county register identifies 31 claims. The 12 November 5 roofing originals were recovered, including two instruments that appear to repeat one claim. A & J Ready Mix acknowledged full payment and satisfaction of its earlier claim. Read the lien updates.
Full residential plan1,300 planned units · as of Dec 11, 2025
Emerald Model price not specified
404
TownhomeEst. starting rent$3,500/mo
272
Luxor Model price not specified
213
DuplexEst. starting price$535,000
162
Ranch Model price not specified
144
Majestic Model price not specified
105
Bar lengths compare planned unit counts by product. These are planned homes, not completed homes or recorded sales.
Single-family starting rangeApprox. $460,000–$1.2 million
Across Ranch, Emerald, Luxor, and Majestic; individual model prices are not specified. Prices and rent are expectations as of , not current quotes.
CDD documentSources (2) ↗
Source record
Evidence behind the record
Supports
1300 planned residential units; Emerald: 404; Townhome: 272; Luxor: 213; Duplex: 162; Ranch: 144; Majestic: 105. The December 2025 offering document expected starting single-family sale prices to range from approximately $460,000 to $1.2 million. This range covers the single-family products collectively. It does not establish an individual starting price for Ranch, Emerald, Luxor, or Majestic. These are historical expectations, not current quotes. The December 2025 offering document expected townhome starting rents of approximately $3,500 per month. Historical expected starting monthly rent, not a purchase price or a current rental quote. The December 2025 offering document expected paired duplex starting sale prices of approximately $535,000. Historical expected starting sale price, not a current listing price or recorded closing price.
Master engineer's report and capital-improvement methodology, February 2024
Document date
Feb 1, 2024
Source type
Official offering document
Confidence
Primary source
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Document date
Dec 11, 2025
Source type
Official offering document
Confidence
Primary source
Assessment Area One199 planned units · as of Dec 11, 2025
Emerald, 60-foot lots Model price not specified
86
Paired duplexEst. starting price$535,000
42
TownhomeEst. starting rent$3,500/mo
26
Ranch, 75-foot lots Model price not specified
22
Luxor, 100-foot lots Model price not specified
19
Majestic, 120-foot lots Model price not specified
4
Bar lengths compare planned unit counts by product. These are planned homes, not completed homes or recorded sales.
Single-family starting rangeApprox. $460,000–$1.2 million
Across Ranch, Emerald, Luxor, and Majestic; individual model prices are not specified. Prices and rent are expectations as of , not current quotes.
CDD documentSources (1) ↗
Source record
Evidence behind the record
Supports
199 planned residential units; Emerald, 60-foot lots: 86; Paired duplex: 42; Townhome: 26; Ranch, 75-foot lots: 22; Luxor, 100-foot lots: 19; Majestic, 120-foot lots: 4. The December 2025 offering document expected starting single-family sale prices to range from approximately $460,000 to $1.2 million. This range covers the single-family products collectively. It does not establish an individual starting price for Ranch, Emerald, Luxor, or Majestic. These are historical expectations, not current quotes. The December 2025 offering document expected townhome starting rents of approximately $3,500 per month. Historical expected starting monthly rent, not a purchase price or a current rental quote. The December 2025 offering document expected paired duplex starting sale prices of approximately $535,000. Historical expected starting sale price, not a current listing price or recorded closing price.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Three State Road 78 parcels listed to Okeechobee Redevelopment LLC total 163.11 acres: 14.3, 110.1 and 38.71 acres. They are separate from the Lakefront Estates parcels tracked in the project map.
Lakefront Developers lists “160 Acres Okeechobee” as a current project for single-family homes and commercial uses, in a separate portfolio entry from Lakefront Estates.
Rambam Boulevard at State Road 78. Routes end at representative points along each parcel’s mapped State Road 78 frontage. These are approximate frontage locations, not verified driveways or future development entrances.
Google Maps routes reviewed Oct 13, 2026. Each mode was checked separately.
Nearby parcel ownership and acreage, the separately advertised portfolio project, and Sunbiz authorized-member roles.
Glades County Property Appraiser — parcel A05-39-34-A00-0030-0000
Document date
Oct 13, 2026
Source type
Public record
Confidence
Primary source
Location
Parcel Summary, Owner Information and Sales
Report reviewed October 13, 2026. Lists Okeechobee Redevelopment LLC, 14.3 acres, and a May 10, 2024 warranty-deed sale at book/page 403/1012. The $2,100,000 sale is marked multi-parcel and also appears on the companion parcel; it is one transaction. The appraiser report is a property/sales summary, not the original recorded deed; use codes do not establish zoning or development approval.
Glades County Property Appraiser — parcel A08-39-34-A00-0010-0000
Document date
Oct 13, 2026
Source type
Public record
Confidence
Primary source
Location
Parcel Summary, Owner Information and Sales
Report reviewed October 13, 2026. Lists Okeechobee Redevelopment LLC, 110.1 acres, and a May 10, 2024 warranty-deed sale at book/page 403/1012. The $2,100,000 sale is marked multi-parcel and also appears on the companion parcel; it is one transaction. The appraiser report is a property/sales summary, not the original recorded deed; use codes do not establish zoning or development approval.
Glades County Property Appraiser — parcel A08-39-34-A00-001A-0000
Document date
Oct 13, 2026
Source type
Public record
Confidence
Primary source
Location
Parcel Summary, Owner Information and Sales
Report reviewed October 13, 2026. Lists Okeechobee Redevelopment LLC, 38.71 acres, and a May 10, 2024 warranty-deed sale at book/page 403/989. The $646,000 sale is marked single-parcel. The appraiser report is a property/sales summary, not the original recorded deed; use codes do not establish zoning or development approval.
Glades County parcel GIS — Okeechobee Redevelopment LLC parcels
Document date
Jul 9, 2026
Source type
Public record
Confidence
Primary source
Location
Three matching parcel records; acreage, owner, sale date, book/page and price fields
Service description dates the parcel representation July 9, 2026; retrieved October 13. Tax parcel data is not a survey or an original deed. The 14.3- and 110.1-acre entries share book/page 403/1012 and its $2,100,000 sale; count that transaction once. The 38.71-acre entry lists 403/989 and $646,000.
Current Projects; separate Lakefront Estates and 160 Acres Okeechobee entries
Reviewed October 13, 2026. Lists 160 Acres Okeechobee for single-family homes and commercial uses, separately from Lakefront Estates. Does not identify parcel numbers, titleholder, approved unit counts, permits, or completion dates. The approximate marketing acreage is distinct from the 163.11-acre sum of county parcel entries.
Florida Division of Corporations — Okeechobee Redevelopment LLC
Document date
Oct 13, 2026
Source type
Public record
Confidence
Primary source
Location
Entity detail; document L23000414373; authorized persons and filing information
Live page reviewed October 13, 2026. Filed September 6, 2023; Barry Farkas and Menachem Silber listed as AMBR; Mark Raksin listed as registered agent. Status INACTIVE; last event PENDING REINSTATEMENT, filed July 22, 2026. The review date is not the formation or event date. The filing does not state ownership percentages or capital contributions.
The May 28, 2026 agreement sets a capacity-based allocation for 166 homes and specified commercial uses. The full plan, the 199-unit Assessment Area One mix, and this dated allocation describe different things.
99,000 gallons/day permitted
Authorized
The May 28, 2026 concurrency agreement states permitted wastewater-treatment capacity of 99,000 gallons per day, insufficient for all previously approved Phase 1 development.
Public recordAs of May 28, 2026
PDF pages 1–3. Additional building permits beyond the stated allocation require added permitted capacity and county written approval. Later capacity approvals are not established in this collection. The separate March 12, 2026 DEP modification authorizes eventual expansion to 399,000 gpd; it does not establish completed, available capacity or replace this county allocation.
The May 28, 2026 concurrency agreement states permitted wastewater-treatment capacity of 99,000 gallons per day, insufficient for all previously approved Phase 1 development. PDF pages 1–3. Additional building permits beyond the stated allocation require added permitted capacity and county written approval. Later capacity approvals are not established in this collection. The separate March 12, 2026 DEP modification authorizes eventual expansion to 399,000 gpd; it does not establish completed, available capacity or replace this county allocation.
Recorded 2026-05-29. Document dated 2026-05-28. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 30, 2026.
The concurrency agreement allocates wastewater capacity for 166 residential units using 75,400 gallons per day, plus specified commercial uses using 23,250 gallons per day.
Public recordAs of May 28, 2026
PDF pages 2 and 15: 22 Ranch, 21 Duplex, 100 Emerald, 19 Villa and 4 Villa XL; zero townhouses. This is distinct from the full 1,300-unit plan and the offering-document Assessment Area One mix of 199.
The concurrency agreement allocates wastewater capacity for 166 residential units using 75,400 gallons per day, plus specified commercial uses using 23,250 gallons per day. PDF pages 2 and 15: 22 Ranch, 21 Duplex, 100 Emerald, 19 Villa and 4 Villa XL; zero townhouses. This is distinct from the full 1,300-unit plan and the offering-document Assessment Area One mix of 199.
Recorded 2026-05-29. Document dated 2026-05-28. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 30, 2026.
The attached April 17, 2026 schedule estimates total flow of 98,650 gallons per day against permitted capacity of 99,000 gallons per day. PDF page 15. This is projected design flow, not measured usage.
Recorded 2026-05-29. Document dated 2026-05-28. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 30, 2026.
The May 28, 2026 indemnification agreement addresses 25 additional residential building permits before final plat recording, subject to its conditions.
Public recordAs of May 28, 2026
An agreement to allow permits does not establish that all 25 permits were issued or that the homes were completed.
The May 28, 2026 indemnification agreement addresses 25 additional residential building permits before final plat recording, subject to its conditions. An agreement to allow permits does not establish that all 25 permits were issued or that the homes were completed.
Indemnification for 25 additional permits before final plat — instrument 202622001520
Recording date
May 29, 2026
Source type
Public record
Confidence
Primary source
Location
Instrument 202622001520; Official Records book/page 427/216; 9 PDF pages
Recorded 2026-05-29. Document dated 2026-05-28. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 30, 2026.
April 17, 2026 schedule attached to instrument 202622001519, PDF page 15
Residential product
Units
Allocated gallons/day
Ranch
22
8,800
Duplex
21
8,400
Emerald
100
46,000
Villa
19
9,880
Villa XL
4
2,320
Townhouse
0
0
Total residential
166
75,400
School demand is allocated 9,090 gallons/day for 600 students and 46 employees; shopping plaza 9,560; mikvah 1,600; shul 3,000. The shopping-plaza calculation uses 41,069 square feet of offices and 34,000 square feet of retail, a different description from the earlier facility-size projection below. A separate March 12 DEP permit authorizes eventual expansion to 399,000 gallons/day; the saved records do not establish when the added treatment trains became available for service. Read the agreement summary →
The March 12, 2026 DEP modification authorizes two additional wastewater treatment trains, bringing final permitted treatment capacity to 399,000 gallons per day.
Public recordAs of Mar 12, 2026
PDF pages 3–4 and 18. Annual average daily flow; the original train is 99,000 gpd and the two additional trains total 300,000 gpd. Authorization does not establish completed or operating capacity. The May 2026 county agreement separately allocates demand against 99,000 gpd.
The March 12, 2026 DEP modification authorizes two additional wastewater treatment trains, bringing final permitted treatment capacity to 399,000 gallons per day. PDF pages 3–4 and 18. Annual average daily flow; the original train is 99,000 gpd and the two additional trains total 300,000 gpd. Authorization does not establish completed or operating capacity. The May 2026 county agreement separately allocates demand against 99,000 gpd.
DEP wastewater-treatment expansion permit: 399,000 gallons per day
Authorization does not establish construction completion or operating capacity. The May 2026 county allocation still refers to 99,000 gallons/day; these are different approvals and stages. The document uses both DW3P and DW2P suffixes.
Later records include water-main and collection-system clearances, a 510,000-gallon water-tank permit, and DEP’s September compliance letter. Follow the dated utility record →
Eleven reviewed filings name the developer as property owner. Four October 28 Beacon / QXO claims allege $16,814.06 unpaid for roofing/building products on four lots under Treasure Coast Roofing contracts. The four October 20–21 claims separately allege $29,718.73 across five lots, with unspecified additional charges sought by Preferred Materials; one claim covers a duplex pair. The filings concern work furnished earlier in the year and do not establish new construction, a work stoppage or current verified balances. Read the claims and lot matches →
Seventeen notices name Amboy Builders and contain 16 distinct permit and parcel references in Blocks 1, 2 and 5. Two instruments repeat Block 5, Lot 18. The permit references already appear in the permit register; the notices add documentation without increasing the permit count. Each repeats a $20 million surety figure, with no bond copy attached. The October 7 notice for Block 1, Lot 20, incorporated October 19, adds permit reference 2600501, also already in the permit register. Together these 18 notices contain 17 distinct stated permit and parcel references. They do not establish new home counts or separate $20 million bonds. See the construction update · Browse the source records
The Phase 1 plat was recorded June 3, 2026 as instrument 202622001571, book 427, page 289, with 25 PDF pages. The county code is PLR, but this document is a plat. It is not a partial mortgage release or an individual home deed.
Lakefront Estates Phase 1 recorded plat — instrument 202622001571
Recording date
Jun 3, 2026
Source type
Public record
Confidence
Primary source
Location
Instrument 202622001571; Official Records book/page 427/289; 25 PDF pages
Recorded 2026-06-03. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 24, 2026.
The February 13, 2026 county-attorney affidavit identifies two developer performance bonds totaling $44,817,636: $20 million dated April 11, 2025 and $24,817,636 dated January 29, 2026.
Public recordAs of Feb 13, 2026
PDF pages 1, 52 and 54. The developer is principal, Great Midwest Insurance Company surety, and Glades County obligee. These are improvement assurances, not CDD bond proceeds or construction spending.
The February 13, 2026 county-attorney affidavit identifies two developer performance bonds totaling $44,817,636: $20 million dated April 11, 2025 and $24,817,636 dated January 29, 2026. PDF pages 1, 52 and 54. The developer is principal, Great Midwest Insurance Company surety, and Glades County obligee. These are improvement assurances, not CDD bond proceeds or construction spending.
Phase 1 construction assurances and performance bonds — instrument 202622000484
Recording date
Feb 20, 2026
Source type
Public record
Confidence
Primary source
Location
Instrument 202622000484; Official Records book/page 423/607; 55 PDF pages
Recorded 2026-02-20. Document dated 2026-02-13. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 30, 2026.
The construction-assurance agreement requires inspection and acceptance of required improvements before certificates of occupancy for a phase. The second amended development agreement assigns roadway, wastewater and common-element responsibilities and keeps internal roads outside county maintenance.
The November 1 broader-name search adds seven April 2025 Emerald notices naming DGC Development Corp. and two July 2026 Villa XL notices naming Amboy Builders. These older recordings increase the document count, without establishing new starts or completed homes. Read the notice update.
Lots and units by phaseVilla XL, Villa, Emeralds, Ranch, Duplex, and Multifamily are the names on this schedule. The offering document uses Majestic, Luxor, Emerald, Ranch, duplex, and townhome for the same unit totals.
Type
Phase 1A
Phase 1B
Phase 2
Phase 3
Phase 4
Entire site
Lots
Units
Lots
Units
Lots
Units
Lots
Units
Lots
Units
Lots
Units
Villa XLMajestic
4
4
20
20
8
8
19
19
54
54
105
105
VillaLuxor
19
19
28
28
32
32
86
86
48
48
213
213
EmeraldsEmerald
84
84
105
105
95
95
92
92
28
28
404
404
RanchRanch
23
23
27
27
34
34
20
20
40
40
144
144
DuplexDuplex
42
42
12
12
50
50
50
50
8
8
162
162
MultifamilyTownhome
3
24
17
234
0
0
0
0
2
14
22
272
Total
175
196
209
426
219
219
267
267
180
192
1,050
1,300
Phase 1A in this schedule is 196 units. Assessment Area One in the offering document is 199 units. Those are separate counts. A zero means the schedule shows no lots or units of that type in that phase.
Secondary reportSources (1) ↗
Source record
Evidence behind the record
Supports
Phase schedule: Villa XL (Majestic); Villa (Luxor); Emeralds (Emerald); Ranch (Ranch); Duplex (Duplex); Multifamily (Townhome). Phase 1A 175 lots and 196 units. Entire site 1050 lots and 1300 units.
Residential lots and units by phase
Document date
Oct 7, 2026
Source type
Secondary report
Confidence
Secondary source
Phase schedule of lots and units. Type totals match the offering-document unit counts. Phase 1A in this table is 196 units, separate from the offering document's 199-unit Assessment Area One.
The project land is in unincorporated Glades County, Florida, described in official materials as east of State Road 78 and north of Tomato Grade Road. Marketing uses an Okeechobee address identity. That is not the same as a location in Okeechobee County.
The project land is in unincorporated Glades County, Florida, described in official materials as east of State Road 78 and north of Tomato Grade Road. Marketing uses an Okeechobee address identity. That is not the same as a location in Okeechobee County.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Document date
Dec 11, 2025
Source type
Official offering document
Confidence
Primary source
525–526 acres
Approximate
Approximate development size is 525 to 526 gross acres, depending on document rounding.
Assessment Area One plans approximately 209,836 square feet of commercial uses.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Document date
Dec 11, 2025
Source type
Official offering document
Confidence
Primary source
Planned
Commercial square footage is not a single settled number. One offering-document summary describes approximately 780,000 square feet of commercial uses. A methodology table contains 30,697 square feet of commercial-religious uses plus 806,585 square feet of other commercial uses.
Conflicting sourcesAs of Dec 11, 2025
Both commercial-area figures are shown. They come from different tables.
Commercial square footage is not a single settled number. One offering-document summary describes approximately 780,000 square feet of commercial uses. A methodology table contains 30,697 square feet of commercial-religious uses plus 806,585 square feet of other commercial uses. Both commercial-area figures are shown. They come from different tables.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Document date
Dec 11, 2025
Source type
Official offering document
Confidence
Primary source
Master engineer's report and capital-improvement methodology, February 2024
Document date
Feb 1, 2024
Source type
Official offering document
Confidence
Primary source
Dated observation
A December 2025 offering document described the target market as the Ultra-Orthodox Jewish community in the Northeast U.S.
Official offering documentAs of Dec 11, 2025
This is the document's statement. It is not this site's housing preference, and it is not a classification of any resident or buyer.
A December 2025 offering document described the target market as the Ultra-Orthodox Jewish community in the Northeast U.S. This is the document's statement. It is not this site's housing preference, and it is not a classification of any resident or buyer.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Document date
Dec 11, 2025
Source type
Official offering document
Confidence
Primary source
Dated observation
The same project materials state that the development is open to all buyers.
The same project materials state that the development is open to all buyers.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Document date
Dec 11, 2025
Source type
Official offering document
Confidence
Primary source
The target-market sentence is the offering document's statement. This site does not classify any buyer or resident by religion and does not offer housing.
By November 2025, seven model homes were reported constructed and approximately 52 homes were reported under construction, with approximately 25 more expected to start in December 2025.
By November 2025, seven model homes were reported constructed and approximately 52 homes were reported under construction, with approximately 25 more expected to start in December 2025.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Current status County permit 2600285 lists issue date 2026-04-30. The October 8, 2026 record has a blank completion field and no CO attachment identified.
CDD documentSources (3) ↗
Source record
Evidence behind the record
Supports
Shopping plaza: 75,420 sq ft; historical projected cost $10.5 million; historical schedule January 2026 start, August 2026 completion. County permit 2600285 lists issue date 2026-04-30. The October 8, 2026 record has a blank completion field and no CO attachment identified.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Document date
Dec 11, 2025
Source type
Official offering document
Confidence
Primary source
Shopping center notice — instrument 202622001265
Recording date
May 6, 2026
Source type
Public record
Confidence
Primary source
Location
Instrument 202622001265; Official Records book/page 426/7; 1 PDF pages
Recorded 2026-05-06. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 24, 2026.
Current status County permit 2500274 lists issue date 2026-03-20. The October 8, 2026 record has a blank completion field and no CO attachment identified.
CDD documentSources (3) ↗
Source record
Evidence behind the record
Supports
Private school and event hall: 50,650 sq ft; historical projected cost $7.0 million; historical schedule December 2025 start, August 2026 completion. County permit 2500274 lists issue date 2026-03-20. The October 8, 2026 record has a blank completion field and no CO attachment identified.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Document date
Dec 11, 2025
Source type
Official offering document
Confidence
Primary source
School notice — instrument 202622000784
Recording date
Mar 20, 2026
Source type
Public record
Confidence
Primary source
Location
Instrument 202622000784; Official Records book/page 424/485; 1 PDF pages
Recorded 2026-03-20. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 24, 2026.
Current status The permit register identifies shopping-center permit 2600285 and an earlier New Store entry 2500153 with no project description or issue date. The record does not identify either as a separate 65,535-sq-ft grocery store or confirm its completion.
CDD documentSources (3) ↗
Source record
Evidence behind the record
Supports
Kosher grocery store: 65,535 sq ft; historical projected cost $9.2 million; historical schedule February 2026 start, November 2026 completion. The permit register identifies shopping-center permit 2600285 and an earlier New Store entry 2500153 with no project description or issue date. The record does not identify either as a separate 65,535-sq-ft grocery store or confirm its completion.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Current status County permit 2600485 lists issue date 2026-08-13. The October 8, 2026 record has a blank completion field and no CO attachment identified. The July 2026 plan describes a 12,787-sq-ft shul and a 5,217-sq-ft mikvah, including a later 2,342-sq-ft mikvah stage; the figures above remain the earlier offering-document projection.
CDD documentSources (4) ↗
Source record
Evidence behind the record
Supports
Synagogue: 15,356 sq ft; historical projected cost $2.3 million; historical schedule March 2026 start, September 2026 completion. County permit 2600485 lists issue date 2026-08-13. The October 8, 2026 record has a blank completion field and no CO attachment identified. The July 2026 plan describes a 12,787-sq-ft shul and a 5,217-sq-ft mikvah, including a later 2,342-sq-ft mikvah stage; the figures above remain the earlier offering-document projection.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Recorded 2026-06-12. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 24, 2026.
Current status County permit 2600472 lists issue date 2026-08-17. The October 8, 2026 record has a blank completion field and no CO attachment identified. The July 2026 plan describes a 12,787-sq-ft shul and a 5,217-sq-ft mikvah, including a later 2,342-sq-ft mikvah stage; the figures above remain the earlier offering-document projection.
CDD documentSources (4) ↗
Source record
Evidence behind the record
Supports
Ritual bathhouse: 2,875 sq ft; historical projected cost $430,000; historical schedule April 2026 start, September 2026 completion. County permit 2600472 lists issue date 2026-08-17. The October 8, 2026 record has a blank completion field and no CO attachment identified. The July 2026 plan describes a 12,787-sq-ft shul and a 5,217-sq-ft mikvah, including a later 2,342-sq-ft mikvah stage; the figures above remain the earlier offering-document projection.
Lakefront Estates CDD Limited Offering Memorandum / Official Statement
Recorded 2026-06-12. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 24, 2026.