What the record says#
The affidavit states that the developer supplied a $20,000,000 performance bond dated April 11, 2025 and a $24,817,636 performance bond dated January 29, 2026, totaling $44,817,636.
PDF page 1The attached bonds name the developer as principal, Great Midwest Insurance Company as surety, and Glades County as obligee.
PDF pages 52, 54The assurance agreement requires security of at least 125% of the relevant projected cost and describes inspection and release procedures.
PDF pages 14, 15Composite Exhibit C extends the construction timetable and projected-cost exhibits to all of Phase 1, including Phases 1A and 1B.
PDF pages 38, 39, 41The Phase 1 cost cover lists $28,063,135 civil improvements, $3,301,211.25 offsite watermain and $3,773,722 wastewater treatment, totaling $35,138,068.25.
PDF page 43The cover's printed total including 25% is $43,922,685.32. Multiplying its stated base cost by 1.25 instead gives $43,922,585.31 after rounding; both figures are preserved rather than silently changing the document.
PDF page 43The attachments include B&B Site Development contract material and DNM and Johnson Engineering cost exhibits.
PDF pages 29, 30, 31, 36, 48, 49The bond forms state that they benefit the named obligee, exclude ongoing maintenance and certain design liabilities, and limit the surety's aggregate liability to each bond's stated amount.
PDF pages 52, 54
How to read this record#
Performance bonds are financial assurances for improvements, not bond proceeds paid to the developer, CDD issued debt, or money already spent.
The appended estimates have different dates and scopes. The 125% calculation and the actual performance-bond principal total are separate figures.
County index description#
AFFIDAVIT OF RECORDATION OF FIRST AMENDMENT TO EXHIBIT B AND FIRST AMENDMENT TO EXHIBIT C OF DEVELOPER OBLIGATIONS/REQUIRED IMPROVEMENT CONSTRUCTION AND ASSURANCE AGREEMENT FOR LAKEFRONT ESTATES PLANNED DEVLEOPMENT PROJECT AND PERFORMANCE BONDS FOR ALL OF PHASE 1 FOR LAKEPORT ESTATES PLANNED DEVELOPMENT PROJECT
The supplied name searches matched the To field in the county index. The source context below preserves the matched names and search scope. Index labels do not substitute for the parties’ roles stated in the document.
Related recorded instruments#
Figures supported by this document#
- The February 13, 2026 county-attorney affidavit identifies two developer performance bonds totaling $44,817,636: $20 million dated April 11, 2025 and $24,817,636 dated January 29, 2026.
- The Phase 1 cost cover recorded February 20, 2026 totals projected improvements at $35,138,068.25.
- The same cover prints $43,922,685.32 as the projected cost including 25%.
In the project timeline#
Reporting using this record#
Retrieve the original#
Search the Glades County official-records portal using instrument 202622000484, or book 423, page 607. County image-session links can expire.
Search county records ↗ Opens a leaving notice in a new tab.Public record Sources (1) ↗
Source record
Evidence behind the record
Supports
A county-attorney affidavit records amended Phase 1 improvement exhibits and two performance bonds totaling $44,817,636.
-
Phase 1 construction assurances and performance bonds — instrument 202622000484
- Recording date
- Feb 20, 2026
- Source type
- Public record
- Confidence
- Primary source
- Location
- Instrument 202622000484; Official Records book/page 423/607; 55 PDF pages
Read page-cited instrument summary →
Recorded 2026-02-20. Document dated 2026-02-13. Retrieve by instrument number from the county search portal. Source-page summaries appear in the instrument register. Downloaded October 7, 2026; county verification notice through September 30, 2026.
Summaries identify the source pages. The original PDF controls if a transcription differs. Glades County records have been checked through Oct 28, 2026; see the collection scope. Acquisition dates and the limits of earlier collection batches remain in the source entries.
Cite this page
Lakefront Okeechobee Report. “Phase 1 construction assurances and performance bonds · 202622000484.” https://lakefrontokeechobee.com/records/202622000484/
Keep the source dates and qualifications with any quoted figure. Download the public data.