Florida DEP Nexus
DEP September compliance letter and August wastewater inspection
DEP’s September 25 letter determines the facility in compliance after correction of findings from its August 28 inspection.
Site updated
Sources added through Nov 1, 2026; each fact retains its own date.
Glades County records checked through . Individual sources and historical collection batches retain their own dates.
← Findings and collection coverage · File catalog entry
What the document establishes#
The cover letter says that findings identified during the August 28, 2026 compliance and sewer-overflow-prevention inspections had been corrected and determines the facility in compliance.
Document text PDF page1 ↗ Opens a leaving notice in a new tab.The attached inspection form preserves an earlier overall “Significant Out of Compliance” rating. The narrative says overdue collection-system and power-outage plans were submitted September 25, with no further action.
Document text PDF pages2, 5, 6 ↗ Opens a leaving notice in a new tab.An air-line leak was corrected onsite before the inspection ended.
Document text PDF page7 ↗ Opens a leaving notice in a new tab.At the August 28 inspection, the report described the facility as not operating or discharging effluent; only the rapid-infiltration basins were fully constructed within the described reuse system.
Document text PDF pages8, 9 ↗ Opens a leaving notice in a new tab.The report records a February 6, 2026 completion notification for the original facility and says another notification would be required for the permit modification.
Document text PDF page5 ↗ Opens a leaving notice in a new tab.
Qualifications#
Read the attached inspection ratings with the later cover letter and corrective-action entries. The August operating observation is not a finding about conditions on October 8. The report’s facility-type field says “Concrete Batch Plant,” although the permit, facility name and substantive inspection concern wastewater.
Page references count PDF pages from the beginning. Printed numbering may differ. These selected findings do not reproduce the entire document.
Related figures and claims#
Timeline#
Source record#
Public record Sources (1) ↗
Source record
Evidence behind the record
Supports
DEP’s September 25 letter determines the facility in compliance after correction of findings from its August 28 inspection.
-
DEP September compliance letter and August wastewater inspection
- Document date
- Sep 25, 2026
- Source type
- Public record
- Confidence
- Primary source
- Location
- PDF pages 1, 2, 5, 6, 7, 8, 9
Read the attached inspection ratings with the later cover letter and corrective-action entries. The August operating observation is not a finding about conditions on October 8. The report’s facility-type field says “Concrete Batch Plant,” although the permit, facility name and substantive inspection concern wastewater.
Open the original document ↗ Opens a leaving notice in a new tab.
Cite this page
Lakefront Okeechobee Report. “DEP September compliance letter and August wastewater inspection.” https://lakefrontokeechobee.com/expanded-records/expanded-8e206a062538d177/
Keep the source dates and qualifications with any quoted figure. Download the public data.