Florida DEP Nexus
Original DEP wastewater-treatment plant permit
The original permit authorized a 0.099-MGD treatment plant and rapid-infiltration system.
Site updated
Sources added through Nov 1, 2026; each fact retains its own date.
Glades County records checked through . Individual sources and historical collection batches retain their own dates.
← Findings and collection coverage · File catalog entry
What the document establishes#
The original permit authorizes a 0.099-MGD annual-average treatment plant with a four-stage Bardenpho process and a 0.099-MGD rapid-infiltration system.
Document text PDF page3 ↗ Opens a leaving notice in a new tab.The permit expires August 14, 2029 and describes three infiltration cells totaling 136,004 square feet of bottom area.
Document text PDF page3 ↗ Opens a leaving notice in a new tab.
Qualifications#
The March 12, 2026 modification separately authorizes expansion. The original capacity remains relevant to the county’s May 2026 concurrency allocation.
Page references count PDF pages from the beginning. Printed numbering may differ. These selected findings do not reproduce the entire document.
Timeline#
Source record#
Public record Sources (1) ↗
Source record
Evidence behind the record
Supports
The original permit authorized a 0.099-MGD treatment plant and rapid-infiltration system.
-
Original DEP wastewater-treatment plant permit
- Document date
- Aug 15, 2024
- Source type
- Public record
- Confidence
- Primary source
- Location
- PDF pages 3
The March 12, 2026 modification separately authorizes expansion. The original capacity remains relevant to the county’s May 2026 concurrency allocation.
Open the original document ↗ Opens a leaving notice in a new tab.
Cite this page
Lakefront Okeechobee Report. “Original DEP wastewater-treatment plant permit.” https://lakefrontokeechobee.com/expanded-records/expanded-aca77686d126a995/
Keep the source dates and qualifications with any quoted figure. Download the public data.