Florida DEP Nexus
DEP partial clearance: Phase 1A water distribution, March 26
DEP cleared another described portion of Phase 1A water infrastructure.
Site updated
Sources added through Nov 1, 2026; each fact retains its own date.
Glades County records checked through . Individual sources and historical collection batches retain their own dates.
← Findings and collection coverage · File catalog entry
What the document establishes#
Partial clearance under 0081040-124-DSGP covers 774 linear feet of 12-inch PVC, two fire hydrants and two sample points.
Document text PDF page1 ↗ Opens a leaving notice in a new tab.
Qualifications#
Page references count PDF pages from the beginning. Printed numbering may differ. These selected findings do not reproduce the entire document.
Source record#
Public record Sources (1) ↗
Source record
Evidence behind the record
Supports
DEP cleared another described portion of Phase 1A water infrastructure.
-
DEP partial clearance: Phase 1A water distribution, March 26
- Document date
- Mar 26, 2026
- Source type
- Public record
- Confidence
- Primary source
- Location
- PDF pages 1
Page numbers count PDF pages, starting at one.
Open the original document ↗ Opens a leaving notice in a new tab.
Cite this page
Lakefront Okeechobee Report. “DEP partial clearance: Phase 1A water distribution, March 26.” https://lakefrontokeechobee.com/expanded-records/expanded-a5cf4809d7d1bcb2/
Keep the source dates and qualifications with any quoted figure. Download the public data.