Weather
Weather & climate guide
Search

Florida DEP Nexus

Engineer second response: groundwater and irrigation-water blend

The engineer revised the monitoring and blend proposal, withdrew a report-only TDS request, and described the system’s status in July.

Site updated

Sources added through Nov 1, 2026; each fact retains its own date.

Glades County records checked through . Individual sources and historical collection batches retain their own dates.

← Findings and collection coverage · File catalog entry

Document date / period
2026-07-15Date read in the document.
Source pages
68 PDF pages
Document format
PDF

What the document establishes#

  • The response withdraws the request for report-only total dissolved solids (TDS) and states that the final irrigation blend would use a 500 mg/L target.

    Document text PDF page5 ↗ Opens a leaving notice in a new tab.
  • The engineer reports June 29 native-groundwater samples at nine locations averaging 1,414 mg/L TDS, and says the modeled surface-water proportion was lowered. This is an applicant-reported groundwater result, not a drinking-water test or an effluent finding.

    Document text PDF page6 ↗ Opens a leaving notice in a new tab.
  • The response says effluent sampling was not possible because no users were then connected to generate effluent; potable-water and reclaimed-water values in the blend calculation remained estimates.

    Document text PDF page6 ↗ Opens a leaving notice in a new tab.

Qualifications#

Applicant engineering statements and model inputs are attributed to the response. They are not independent findings about delivered drinking water or the system’s later operating status.

No final decision on the -003 application was identified in the saved collection; the March -002 authorization is a separate document.

Some pages are difficult to read. Consult the original for diagrams, handwriting and details that may be unclear in the scan.

Page references count PDF pages from the beginning. Printed numbering may differ. These selected findings do not reproduce the entire document.

Timeline#

Source record#

Public record Sources (1) ↗

Source record

Evidence behind the record

Supports

The engineer revised the monitoring and blend proposal, withdrew a report-only TDS request, and described the system’s status in July.

  1. Engineer second response: groundwater and irrigation-water blend

    Document date
    Jul 15, 2026
    Source type
    Public record
    Confidence
    Primary source
    Location
    PDF pages 5, 6

    Read page-cited summary →

    Applicant engineering statements and model inputs are attributed to the response. They are not independent findings about delivered drinking water or the system’s later operating status. No final decision on the -003 application was identified in the saved collection; the March -002 authorization is a separate document.

    Open original source ↗ Opens a leaving notice in a new tab.

Open the original document ↗ Opens a leaving notice in a new tab.

Cite this page

Lakefront Okeechobee Report. “Engineer second response: groundwater and irrigation-water blend.” https://lakefrontokeechobee.com/expanded-records/expanded-a2c3170650d1cd0c/

Keep the source dates and qualifications with any quoted figure. Download the public data.

The public record

Search Lakefront

Try 1464 Alfasi, block 6 lot 2, a parcel ID, or a topic.