Florida DEP Nexus
Corrected DEP permit: Phase 1A vacuum-sewer construction
The corrected permit letter describes the Phase 1A vacuum-sewer construction authorization.
Site updated
Sources added through Nov 1, 2026; each fact retains its own date.
Glades County records checked through . Individual sources and historical collection batches retain their own dates.
← Findings and collection coverage · File catalog entry
What the document establishes#
The permit identifies its original issue date as January 22, 2025 and expiration as January 21, 2030.
Document text PDF page4 ↗ Opens a leaving notice in a new tab.Authorized works include one vacuum pump station, 87 valve pits, seven buffer tanks and 12,163 linear feet of vacuum sewer pipe.
Pipe total derived from 3,633 + 2,545 + 5,985 linear feet. PDF page4 ↗ Opens a leaving notice in a new tab.
Qualifications#
The October date is the corrected-letter record date. It is not a second initial permit issuance or proof of completion.
Page references count PDF pages from the beginning. Printed numbering may differ. These selected findings do not reproduce the entire document.
Source record#
Public record Sources (1) ↗
Source record
Evidence behind the record
Supports
The corrected permit letter describes the Phase 1A vacuum-sewer construction authorization.
-
Corrected DEP permit: Phase 1A vacuum-sewer construction
- Document date
- Oct 6, 2025
- Source type
- Public record
- Confidence
- Primary source
- Location
- PDF pages 4
The October date is the corrected-letter record date. It is not a second initial permit issuance or proof of completion.
Open the original document ↗ Opens a leaving notice in a new tab.
Cite this page
Lakefront Okeechobee Report. “Corrected DEP permit: Phase 1A vacuum-sewer construction.” https://lakefrontokeechobee.com/expanded-records/expanded-724c774183c4d75f/
Keep the source dates and qualifications with any quoted figure. Download the public data.