Florida DEP Nexus
Engineer response: phased wastewater storage and reuse proposal
The applicant’s engineer described future storage phases, proposed effluent routing and eventual removal of the infiltration basins.
Site updated
Sources added through Nov 1, 2026; each fact retains its own date.
Glades County records checked through . Individual sources and historical collection batches retain their own dates.
← Findings and collection coverage · File catalog entry
What the document establishes#
The engineer proposes effluent storage tanks 1 and 2 in future phases 2C/3 and requests phased capacity increases and clearances tied to constructed upgrades under one permit.
Document text PDF page2 ↗ Opens a leaving notice in a new tab.The response proposes retaining R-001 as a wet-weather backup while routing disinfected effluent to R-002 storage and irrigation in phases 2A/2B, followed by basin demolition in phase 2C.
Document text PDF pages2, 3 ↗ Opens a leaving notice in a new tab.
Qualifications#
These are proposed operating and construction arrangements in an applicant response, not evidence that the upgrades were approved or completed.
Some pages are difficult to read. Consult the original for diagrams, handwriting and details that may be unclear in the scan.
Page references count PDF pages from the beginning. Printed numbering may differ. These selected findings do not reproduce the entire document.
Timeline#
Source record#
Public record Sources (1) ↗
Source record
Evidence behind the record
Supports
The applicant’s engineer described future storage phases, proposed effluent routing and eventual removal of the infiltration basins.
-
Engineer response: phased wastewater storage and reuse proposal
- Document date
- Jun 9, 2026
- Source type
- Public record
- Confidence
- Primary source
- Location
- PDF pages 2, 3
These are proposed operating and construction arrangements in an applicant response, not evidence that the upgrades were approved or completed.
Open the original document ↗ Opens a leaving notice in a new tab.
Cite this page
Lakefront Okeechobee Report. “Engineer response: phased wastewater storage and reuse proposal.” https://lakefrontokeechobee.com/expanded-records/expanded-606943ea2f6bba4e/
Keep the source dates and qualifications with any quoted figure. Download the public data.