Weather
Weather & climate guide
Search

Florida DEP Nexus

DEP construction permit: additional vacuum-sewer phases

DEP authorized collection-system construction for Phases 1G, 1H, 1J, 1K and part of Ephod Road.

Site updated

Sources added through Nov 1, 2026; each fact retains its own date.

Glades County records checked through . Individual sources and historical collection batches retain their own dates.

← Findings and collection coverage · File catalog entry

Document date / period
2026-01-08Date read in the document.
Source pages
8 PDF pages
Document format
PDF

What the document establishes#

Qualifications#

Page references count PDF pages from the beginning. Printed numbering may differ. These selected findings do not reproduce the entire document.

Timeline#

Source record#

Public record Sources (1) ↗

Source record

Evidence behind the record

Supports

DEP authorized collection-system construction for Phases 1G, 1H, 1J, 1K and part of Ephod Road.

  1. DEP construction permit: additional vacuum-sewer phases

    Document date
    Jan 8, 2026
    Source type
    Public record
    Confidence
    Primary source
    Location
    PDF pages 4

    Read page-cited summary →

    Page numbers count PDF pages, starting at one.

    Open original source ↗ Opens a leaving notice in a new tab.

Open the original document ↗ Opens a leaving notice in a new tab.

Cite this page

Lakefront Okeechobee Report. “DEP construction permit: additional vacuum-sewer phases.” https://lakefrontokeechobee.com/expanded-records/expanded-3f73c5949c56e209/

Keep the source dates and qualifications with any quoted figure. Download the public data.

The public record

Search Lakefront

Try 1464 Alfasi, block 6 lot 2, a parcel ID, or a topic.