Weather
Weather & climate guide
Search

Florida DEP Nexus

DEP partial clearance: Phase 1B and 2 water mains

DEP released specified Phase 1B and 2 water infrastructure for service.

Site updated

Sources added through Nov 1, 2026; each fact retains its own date.

Glades County records checked through . Individual sources and historical collection batches retain their own dates.

← Findings and collection coverage · File catalog entry

Document date / period
2026-09-24Date read in the document.
Source pages
2 PDF pages
Document format
PDF

What the document establishes#

Qualifications#

The full-release option is unmarked. This is a partial clearance, despite a separate earlier submission labeled total clearance.

Page references count PDF pages from the beginning. Printed numbering may differ. These selected findings do not reproduce the entire document.

Timeline#

Source record#

Public record Sources (1) ↗

Source record

Evidence behind the record

Supports

DEP released specified Phase 1B and 2 water infrastructure for service.

  1. DEP partial clearance: Phase 1B and 2 water mains

    Document date
    Sep 24, 2026
    Source type
    Public record
    Confidence
    Primary source
    Location
    PDF pages 1

    Read page-cited summary →

    The full-release option is unmarked. This is a partial clearance, despite a separate earlier submission labeled total clearance.

    Open original source ↗ Opens a leaving notice in a new tab.

Open the original document ↗ Opens a leaving notice in a new tab.

Cite this page

Lakefront Okeechobee Report. “DEP partial clearance: Phase 1B and 2 water mains.” https://lakefrontokeechobee.com/expanded-records/expanded-28523a3d950c17b6/

Keep the source dates and qualifications with any quoted figure. Download the public data.

The public record

Search Lakefront

Try 1464 Alfasi, block 6 lot 2, a parcel ID, or a topic.