County permit record
Permit 2600472 TBD
Mikvah
Site updated
Sources added through Nov 1, 2026; each fact retains its own date.
Glades County records checked through . Individual sources and historical collection batches retain their own dates.
← All building permits · County permit page ↗ Opens a leaving notice in a new tab.
How to read this record#
Dates and inspection entries are the county portal’s October 8, 2026 observations. Requests, scheduled dates and completed inspection dates are different fields.
A blank date is not proof that an event did not occur. A permit completion date or passed final inspection is not itself a certificate of occupancy.
Repeated inspection entries are preserved as displayed; failed inspections are historical entries, not automatically unresolved violations.
The portal’s expiration field is reported without inferring present validity, extensions or abandonment.
Inspection history#
These are the county’s displayed inspection entries, preserving scheduled and completed dates separately. Inspector names, private contact details, payment identities and message text are excluded.
| Inspection | Recorded result | Scheduled | Completed |
|---|---|---|---|
| Electrical Power Release | Passed | 2026-10-07 | 2026-10-07 |
| Fire Sprinkler Rough | Pass Pending | 2026-10-07 | 2026-10-07 |
| Underground Electrical | Passed | 2026-09-24 | 2026-09-24 |
| Tie Beam/Lintel | Passed | 2026-09-24 | 2026-09-24 |
| Fire Sprinkler Rough | Passed | 2026-09-18 | 2026-09-18 |
| Slab Inspection | Passed | 2026-09-02 | 2026-09-02 |
| Underground Plumbing | Passed | 2026-09-02 | 2026-09-02 |
Inspection requests (11)
A request date is not an inspection result.
- 2026-10-07 · Fire Sprinkler Rough
- 2026-10-07 · Electrical Power Release
- 2026-10-02 · Fire Line Underground
- 2026-09-24 · Underground Electrical
- 2026-09-24 · Tie Beam/Lintel
- 2026-09-18 · Fire Sprinkler Rough
- 2026-09-08 · Tie Beam/Lintel
- 2026-09-02 · Underground Plumbing
- 2026-09-02 · Slab Inspection
- 2026-09-02 · Electrical Power Release
- 2026-08-12 · Wire Lath Inspection
Permit fee fields#
Total fees: $4,045.78. Amount paid: $4,045.78. Amount due: $0. These are the displayed account fields, not the cost of constructing the property.
Permit documents#
Open the county documents for plans, applications and supporting records. An attachment’s presence does not establish approval or completion.
- _009M-Fire_Sprinkler_Shops_and_Calcs.-202608201456_-DG_Review.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- Termite_Spray_-_Mikvah.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- Signed_NOC_-_Mikvah_Permit_2600472_.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- Shul_and_Mikvah_Water_Supply_Data.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_20.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_19.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_18.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_17.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_16.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_15.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_14.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_13.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_12.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_11.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_10.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_9.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_8.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_7.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_6.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_5.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_4.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_3.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_2.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- LFE_-_Shul_Mikva_Site_Plan_2026-04-28_1.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- Load_Calcs_Mikvah.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- Express_Review_Checklist.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- Energy_Calc_Mikvah.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- Approval_Letter_01.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2026_Annual_Fire_Hydrant_Report_-_Synogogue.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2026_Annual_Fire_Hydrant_Report_-_Mikvah.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2019-030_Fire_System_Certification_20260423_ss.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 0224-0703_1.1_SHUL_AND_MIKVAH_Fire_Exhibit.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_P104_Mikvah_Plumbing_Isometrics.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_P103_Mikvah_Roof_Plumbing_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_P102_Mikvah_Sanitary_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_P101_Mikvah_Domestic_Water_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_P001_Plumbing_Index_Symbol_Legend_and_Notes_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_M201_Mechanical_Details.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_M102_Mikvah_Roof_Mechanical_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_M101_Mikvah_Mechanical_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_M002_Mechanical_Index_Symbol_Legend_and_Notes_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_M001_Mechanical_Index_Symbol_Legend_and_Notes_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_E104_Mikvah_Ligthing_Control_Details.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_E103_Mikvah_Riser_Diagram_and_Panel_Schedules.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_E102_Mikvah_Roof_Electrical_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_E100_Mikvah_Electrical_Floor_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 230515_D_E001_Electrical_Index_Symbol_Legend_and_Notes_Plan.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S545_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S531_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S521_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S516_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S502_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S501_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S301_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S201_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S103_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S102_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S101_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S005_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S004_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S003_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S002_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2318_06_Structural_S001_23-12-13_SIGNED.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- SURVEY-SYNAGOGUE_TRACT_1_6-8-26.pdf ↗ Opens a leaving notice in a new tab. · Catalog
- 2024_0909_MIKVAH_Revsion_Signed_and_Sealed.pdf ↗ Opens a leaving notice in a new tab. · Catalog
Public record Sources (1) ↗
Source record
Evidence behind the record
Supports
County permit 2600472 as observed October 8, 2026, with separately dated November 1 occupancy findings where shown.
-
Glades County building permit 2600472
- Document date
- Oct 8, 2026
- Source type
- Public record
- Confidence
- Primary source
- Location
- Permit Information; Contractors; Inspections; Fees; Uploaded Files
County portal observed October 8, 2026. This date is the observation date; issue and completion dates are recorded separately.
Cite this page
Lakefront Okeechobee Report. “Building permit 2600472 · TBD.” https://lakefrontokeechobee.com/building-permits/2600472/
Keep the source dates and qualifications with any quoted figure. Download the public data.